Overview Hub

System Live: Ward 4 Console
00:00:00 PM

Total Waste Processed

84.5 Tons
14.5% this month

Active Fleet Count

4
100% telemetry online

Diversion Index

96.4%
48.2 Tons CO₂ offset

Panvel C&D Lifecycle Workflow

Dynamic tracker tracing aggregate waste from citizen request registration through transit to compliance plant processing.

1
PMC Onboarding
Transporters register trucks & drivers with active Telemetry GPS IDs.
2
Pickup Request
Builders log request details, waste tonnage, and select registered transporters.
3
Logistics & GPS
Transporter dispatches truck. GPS telemetry validates route to block illegal dumping.
4
Plant Process
Recycler weighs inbound load, logs fraction yields, and issues digital certificates.

Explore Prototype Perspectives

Use the sidebar options or click the quick-links below to explore different actors and test the integrated workflow loop.

PMC Admin

Role 1
  • Register fleet vehicles & driver credentials
  • Add Telemetry API device IDs
  • Monitor master log & export PDF reports

Citizen / Builder

Role 2
  • Submit C&D Waste Pickup requests
  • Search certified transporters dynamically
  • Track truck transit status via GPS map

Transporter

Role 3
  • Accept assigned transit requests
  • Trigger dispatch & map simulation
  • Confirm delivery clearance at the plant

Recycler Plant

Role 4
  • Log weighbridge inbound truck weight
  • Calculate recycling aggregate yields
  • Print PDF compliance certificates

Live Event Logs Feed

Real-time transaction trail of operations.

Total Registrations

242
100% verified

Registered Fleet

4
Certified vehicles

Total Waste Inflow

84.5 Tons
Across 18 pick-ups

Register Certified Vehicle / Carrier

Active Connection

C&D Inflow Analytics

Daily construction waste inflow tracked in tons.

Mon
Tue
Wed
Thu
Fri
Sat
Sun

Material Category Yield

Concrete & Rubble 54% (45.6T)
Bricks & Masonry 26% (22.0T)
Mixed Soil & Gravel 14% (11.8T)

Active Certified Fleet Registry

Vehicle Plate Carrier Company Driver Name Telemetry API ID

All Requests Master Registry

Req ID Site Location Weight (T) Assigned Carrier Status

System Stakeholder User Directory

Add New User
User Name / Agency System Role Registered ID Verification Status Action
Aditya Builders Corp Citizen / Builder PMC-BLD-9982 Verified
Panvel EcoCarriers Transporter PMC-TRN-3420 Verified
Namo Swachh Transports Transporter PMC-TRN-7419 Verified
Navi Mumbai Recyclers Corp Recycler / Plant PMC-REC-0012 Verified

Transporter License Approvals

Transporter Entity Registered Office Fleet Strength Permit Validity Municipal Status
Sahyadri Carting Co Panvel West, Ward 3 8 Trucks 2028-12-31 Fully Licensed
Civic Waste Logistics Kalamboli Industrial Zone 12 Trucks 2027-06-30 Fully Licensed

Recycling Facility Clearances

Plant Location / Operator Processing Capacity Weighbridge Model Municipal Clearance
Panvel Municipal C&D Plant (Taloja) 150 Tons / Day Avery Weigh-Tronix (Validated) Active Clearance

Landfill Diversion Rate

96.4% C&D Material diverted from Landfills

Carbon Footprint Savings

48.2 Tons CO₂e Prevented

Carbon offsets calculated by tracking truck diesel consumption, route compliance (preventing illegal detour dumping), and aggregate recycling yield efficiency.

Municipal Compliance Reporting Engine

Submit C&D Waste Pickup Request

Drag and drop images here, or browse files

Supports JPG, PNG format (Max 4MB)

Pickup Requests & History

Click any request to launch live transit map tracking below.

Assigned Logistics Operations

Inbound Weighbridge & Yield Logging

No arrived transporter vehicles currently waiting at the plant weighbridge.

Digital Compliance Clearance

Municipal C&D compliance certificate generated in real-time upon weighbridge validation.

Please select and log an arrived vehicle weighbridge receipt to generate compliance certification.

C&D WASTE PROCESSING & CLEARANCE CERTIFICATE

ISSUED UNDER CLEAN MUNICIPALITY ACT WARD-4

Certificate ID: PMC-CD-88910
Original Site Location: Sector 15 flyover
Logistics Carrier: Panvel EcoCarriers (MH-46-A-9921)
GPS Route Validation: 100% Compliant Route
Gross Net Weight Logged: 8.3 Tons (Inbound Tonnage)
Processed Recycle Yield: Concrete: 6.5T | Masonry: 1.8T
Carbon Credit Earned: 4.82 Tons CO₂ offset